Mechanical & Electrical Project Maintenance

Year Project Client
2007 Carry out Hot Tapping and Installation of By-pass Pipeline 
For Chilled Water Systems for the Construction and Completion of the Substructure and Enabling Works for The Proposed Mixed Development on Lot 171 (Lot C) at Persiaran KLCC
Bauer (Malaysia) Sdn Bhd
2008-2009 Appointment as Air Conditioning & Mechanical Ventilation System (ACMV) Operation and Maintenance Management Contractor.
Proposed 26-Storey Commercial on Lot 170 Located At No.24 Jln Perak, 50450 Kuala Lumpur
Malaysian Landed Property Sdn Bhd
Level 7 Menara Maxis, KLCC
2007-2012
2004-2007
2000-2004
Comprehensive HVAC Maintenance Contract at Petronas Twin Towers (1 &2), Masjid Asy Shakirin and Kompleks Dayabumi.
Scope of work includes:
  • Corrective maintenance includes parts procurements and storage of buffer stock.
  • Periodical preventive maintenance§  Predictive works via infrared thermographic scanning, vibration monitoring, indoor air measurement, etc.
Equipment includes:
  • Chillers and accessories, Chilled water pumps
  • Plate Heat exchangers, Cooling Towers
  • Ductwork, Piping, valves & fittings
  • Air handling units, Fans & Blowers,  Air-cooled Package units
  • Heat recovery wheels, Variable frequency drives (ABB)
  • Water treatment, Starter & Control panels
KLCC Urusharta Sdn Bhd
2004-2005 HVAC System Maintenance Contract at ExxonMobil Tower Kuala Lumpur
Contract for the maintenance of the Air Conditioning and Ventilation System at Menara ExxonMobil Kuala Lumpur 
KLCC Urusharta Sdn Bhd
2006 Refurbishment of 600TR Shinwa Cooling Towers at Kompleks Dayabumi Kuala Lumpur
(Contract No: 022/2006)
KLCC Urusharta Sdn Bhd
2004-2006
2002-2004
Plumbing Servicing Contract at Kompleks Dayabumi, Kuala Lumpur
Contract for the plumbing services with scope of work includes:
  • Replacement of water pumps, piping system and plumbing fittings
  • Cleaning & servicing of water pump  tanks.
  • Servicing & repairing electrical switchboard
KLCC Urusharta Sdn Bhd
2004-2005 Comprehensive Air-conditioning System Maintenance for MISC office Menara Dayabumi, Kuala Lumpur
Equipments include:
  • Split units for server rooms
Malaysia International Shipping Corporation Bhd (MISC)
2005 Design, Supply and Install Customized Elevator at Bangsar Hill Kuala Lumpur Rumpun Metro / API
2005 Design, Test and Re-commission of Local Exhaust Ventilation System for Oil & Gas Laboratory at Kerteh, Terengganu Mecip Global Engineers
2005 Engineering Design and Supervision of CCTV, Electrical, Mechanical and Tele-communication Systems. Rumpun Consult

2002

2004

2005

Chiller Replacement and Overhaul at Kompleks Dayabumi
  • Supply, Delivery, Installation, Testing and Commissioning of Carrier 600TR Chiller to the Main Plant Room
  • To carry out chiller overhaul with oil change for 4 nos centrifugal chillers of 1000 refrigeration tonnage. 
KLCC Urusharta Sdn Bhd
2001 HVAC Maintenance at Universiti Islam Antarabangsa, Gomba
Provide service, maintenance and chiller plant room monitoring for 600 tons centrifugal chillers, Chilled water pipes, Air-handling units, fan coils, Cooling Towers and pumps
Property Management Islamic International University
2000-2001 Installation and Maintenance at Hospital Sg. Buloh Apartment
For the Electrical & Communication Works includes:
  • Install 500m underground cable, telecom manholes & ducting
  • Provide electrical wirings, telecomm. & MATV  system
  • Test & commission main switchboards
Tunas Selatan Consortium SB B
1999 Petrosains Museum, KLCC
  • Installation of Fire Protection and Sprinkler system at Rotating Gallery, Petronas Museum
  • Operation & Maintenance for Air-Conditioning, Ventilation, Plumbing, sanitary, Fire Protection and Waterwall Systems

Mint Plaza Sdn Bhd

Stagno Tech Sdn Bhd

1997-1998
(2 years)
MEP Installation Works at Petrosains Museum KLCC
Main Contractor for Supply, Install Commission and Maintenance of Mechanical, Electrical and Plumbing (MEP) Works.
Scope of Works includes:
  • Air-conditioning Ventilation & Systems, Plumbing and Sanitary
  • Electrical, Lighting Fire Protection and Building Control Systems
City-Axis Sdn Bhd for Petronas Carigali
1996-1998
(3 years)
HVAC Installation Works at Petronas Twin Towers KLCC
Main Contractor for Supply, Install Commission and Maintenance of Air-Conditioning & Ventilation Systems.
Scope of work includes:
  • Piping, valves, NDT and insulation Fire and pressure ducts§   Equipment erection; heat exchangers, pumps, air handling units, fancoils, fans, precision computer air-cond, etc.
  • Flushing and Chemical cleanings
  • Testing, balancing commissioning for the systems
Entrecanales-Ekovest for KLCC Berhad